Re: Definition of track/stoppingPlace/platform infrastructure vs. timetable [message #2268 is a reply to message #2253] Thu, 07 November 2019 14:33 Go to previous messageGo to previous message
christian.rahmig is currently offline  christian.rahmig
Messages: 436
Registered: January 2016
Senior Member
christian.rahmig wrote on Mon, 07 October 2019 20:28
Dear Stefan,

thank you for your contribution on the question "What is a track?".

Am 02.10.2019 um 17:00 schrieb Stefan Hubrig:
> [...]
> <xs:documentation>A Track is defined by a railway section
> between two switches/crossings or between a switch/crossing
> and a buffer stop.</xs:documentation>
>
> Does this definition cover tracks in the context of
> timetables? For those, we would want to describe where the
> train stops inside an operationalPoint. In that case, there
> would be a single line track through many operationalPoints
> since there is no switch. What would <track> <length> refer
> to?
>
> If <track> is not the right fit here, what would we choose
> instead?

Following several talks with different railML users and contributors I
can agree that the current definition of a railML <track> seems to be
too strict for certain applications/use cases. There are scenarios like
yours with very long tracks that span over several operational points
and connected switches. On the other side, there are scenarios with very
short tracks or "track sections". In both cases, the constraint that
tracks range from switch/crossing/buffer stop until
switch/crossing/buffer stop, does not match.

My question to the whole community:
Would you like to modify the definition of a railML <track> by removing
the constraints?
In order not to forget about this issue to be solved with railML 3.2 I created Trac ticket #368, see https://trac.railml.org/ticket/368. Still, I would like to hear your opinion about the best definition of a track.

Thank you very much and best regards
Christian

--
Christian Rahmig - Infrastructure scheme coordinator
railML.org (Registry of Associations: VR 5750)
Phone Coordinator: +49 173 2714509; railML.org: +49 351 47582911
Altplauen 19h; 01187 Dresden; Germany www.railml.org


Christian Rahmig – Infrastructure scheme coordinator
railML.org (Registry of Associations: VR 5750)
Altplauen 19h; 01187 Dresden; Germany www.railML.org
 
Read Message
Read Message
Read Message
Read Message
Read Message
Previous Topic: Defintion of is::track type attribute
Next Topic: [railML3] Request for extension of the 'crossing' infrastructure element
Goto Forum:
  


Current Time: Tue May 21 13:08:19 CEST 2024