Multiple train protection systems [message #237] |
Mon, 19 April 2010 15:43 |
Susanne Wunsch railML
Messages: 0 Registered: January 2020
|
|
|
|
There are some lines equipped with PZB and additional systems like LZB
or even ETCS.
How do you define multiple active train protection systems on a track?
<!-- PZB -->
<rail:trainProtectionChange id="tpc0" pos="0"
monitoring="intermittent" medium="inductive"/>
<!-- LZB -->
<rail:trainProtectionChange id="tpc1" pos="500"
monitoring="continuous" medium="cable"/>
Normally, the new *Change entry stops the previous similar entry.
That means, from pos=500 upwards there is _only_ LZB, no PZB.
How do you define this issue?
Any comments would be appreciated.
Kind regards,
Susanne
--
Susanne Wunsch
Schema Coordinator: railML.common
|
|
|