Home » railML newsgroups » railml.interlocking » Clearance indication trigger
Clearance indication trigger [message #3764] Fri, 24 October 2025 12:59 Go to previous message
Terje Nordal is currently offline  Terje Nordal
Messages: 17
Registered: December 2023
Junior Member
Dear all,

As part of engineering of interlocking at Bane NOR, one situation we are required to handle is indicating to a train driver when the back of their train has passed a specific switch clearance. The indication is done either by a trackside lamp (typically in or legacy interlocking systems) or by a notification in the DMI of the train (our ETCS lines). It is often used for stations where long freight trains normally stop, to help them know when they have moved sufficiently long into a track.

In our ETCS engineering we specify this for specific train detectors, in a similar fashion to what we do with route release points (introduced in railML 3.3 as part of #3175). For railML the route release point can be specified as a trigger relating to the <routeExit>. Bane NOR suggest a similar implementation for a "Clearance indication trigger" for railML 3.4.

Best regards
Terje Nordal
Bane NOR
 
Read Message
Read Message
Read Message
Read Message
Previous Topic: Overlaps mith multiple release timers and release sections?
Goto Forum:
  


Current Time: Sun Feb 15 02:21:17 CET 2026